+34605876613 support@acm-sl.com

Video START – STOP operations in a Wind Turbine

This video shows the evolution of the subsystems in a Active Stall, Squirrel Cage Generator Wind Turbine for the two basic operations; START (cuti) , connection to the Grid and generation of power, and STOP (cutout), disconnection from the...

Simulators for Wind Turbines

Simulators for Wind Turbines Abstract – A simulator’s development includes four types of tasks: a) the high level design (splitting the system to simulate in subsystems and writing their specifications); b) the design of the user interface (HMI); c) the actual coding;...

Due diligence in Wind Farms

Due diligence for Wind Farms  When it is necessary to know the current state of a wind farm for financial purposes, it is not enough to do an in-depth inspection of wind turbines (situation “as is”), it is also necessary to analyze the history of each...